Back to Projects
Solar

Chennai Industrial Rooftop

Rooftop solar installation for a manufacturing facility, reducing energy costs by 70%.

Chennai, Tamil Nadu
2 MW
Completed 2024
4 months
Chennai Industrial Rooftop

Project Overview

A comprehensive 2 MW rooftop solar installation across multiple buildings of a large manufacturing facility in Chennai. The system features net metering integration and has achieved a 70% reduction in electricity costs for the client. The installation includes advanced monitoring systems for real-time performance tracking.

Project Highlights

70% energy cost reduction

Net metering enabled

5-year O&M included

Mobile app monitoring

Project Details

Category
Solar
Capacity2 MW
LocationChennai, Tamil Nadu
Completed2024
ClientChennai Manufacturing Ltd.
Duration4 months

Interested in a Similar Project?

Contact us to discuss your renewable energy requirements.

Project Gallery

Chennai Industrial Rooftop - Image 1
Chennai Industrial Rooftop - Image 2
Chennai Industrial Rooftop - Image 3

Ready to Start Your Project?

Let our team of experts help you design and implement the perfect renewable energy solution for your needs.

Energetic Engineers