Back to Projects
Solar
Chennai Industrial Rooftop
Rooftop solar installation for a manufacturing facility, reducing energy costs by 70%.
Chennai, Tamil Nadu
2 MW
Completed 2024
4 months
Project Overview
A comprehensive 2 MW rooftop solar installation across multiple buildings of a large manufacturing facility in Chennai. The system features net metering integration and has achieved a 70% reduction in electricity costs for the client. The installation includes advanced monitoring systems for real-time performance tracking.
Project Highlights
70% energy cost reduction
Net metering enabled
5-year O&M included
Mobile app monitoring
Project Details
Category
Solar
Capacity2 MW
LocationChennai, Tamil Nadu
Completed2024
ClientChennai Manufacturing Ltd.
Duration4 months
Interested in a Similar Project?
Contact us to discuss your renewable energy requirements.
Project Gallery
Related Projects
Explore more solar projects
Ready to Start Your Project?
Let our team of experts help you design and implement the perfect renewable energy solution for your needs.